
Imperial Ice Cools Down Its Electric Bill by Going 100% Solar
Imperial Ice partnered with Delta Solar on a 320 kW solar array designed to offset the full electricity demand of its Little Rock packaged ice operation. The system was expected to save the family-owned business more than $857,000 over 30 years.
One of the most interesting parts of the project was the use of remote net metering. Because Imperial Ice did not have enough room on its main property for the full array, the system was built off-site within the same utility territory, allowing production credits to offset usage at the primary facility.
That structure shows how solar can still work for energy-intensive businesses even when the main site has physical constraints. Warehouses, industrial facilities, and manufacturers do not always need all the solar panels to sit directly next to the load they serve, as long as policy and utility structure allow the project to be designed correctly.
Imperial Ice is a strong example of commercial solar solving a straightforward business problem: electricity was a major operating cost, and the company wanted a durable way to reduce it.
Related Reading
Woodlawn School District completes a 512 kW solar installation with Delta Solar, becoming one of the largest school solar projects in the region.
Delta Solar breaks ground on the Woodlawn School solar project, marking a milestone in educational solar adoption in Arkansas.
Written in 2022, this post explains how the Inflation Reduction Act set the federal solar Investment Tax Credit at 30% for commercial and institutional projects. Tax law has changed since then, so check our Tax Incentives page for the current rules.
Want to model a commercial project with real assumptions?
Start with a practical review of your facility, utility profile, and project options.
Explore Commercial Solar